Muddy River Restoration
Boston, MA
Installed February 2013 - August 2015
A high-profile project along a series of parks created by Frederick Olmsted in the early 1890’s included three small bridges.
Project Team
-
Owner: City of Boston, MA
-
Engineer: U.S. Army Corps of Engineers
-
Contractor: Charter Environmental, Inc.
-
Precast Producer: United Concrete Products, Inc.
Technical Details
-
Span: 24 ft, 24 ft, 16 ft
-
Rise: 10 ft
-
Length: 174 ft, 156 ft, 180 ft
-
Cover: 7 ft, 8 ft 6 in, 7 ft 6 in
-
Live Load: HL-93
-
Skew: None
-
Type: Arch-Box