Route 175 Over New Britain/Hartford Busway

Newington, CT

Installed August 2012

Project Overview

A deteriorating 100’ span box beam bridge built in 1980 over an abandoned railroad right of way was replaced to make way for a new busway road between New Britain and Hartford, CT.

Innovative Construction & Design

A three-stage phase demolition plan was developed to allow Route 175 to remain open during construction. Precast arch units were installed under the existing bridge using a self-propelled modular transport (SPMT) vehicle with a special lifting frame.

The new 48’ span accommodates two traffic lanes, a shoulder, and a bike/pedestrian path.

Project Team

Owner: Connecticut Department of Transportation

Engineer: Connecticut Department of Transportation

Precast Producer: United Concrete Products, Inc.

Technical Details

Span: 48 ft

Length: 150 ft

Rise: 12 ft

Cover: 7 ft

Live Load: HL-93

Skew: None

Type: Arch-Box