Project Overview
Phase II of the Little Cuyahoga River stream restoration project restored over 2,200 linear feet of riverbed.
Habitat & Channel Improvements
River conditions were improved with the addition of functional floodplain areas, longer channel length with a winding stream pattern, riffle-pool features, riparian plantings, and diverse instream habitats.
Bridge Design & Precast Architecture
The project also included two similar bridges at Kelly Ave. and Third Ave. Clear-span precast arches were chosen to stay out of the main channel. Precast headwalls and wingwalls feature a formliner finish, which was stained in the field. The same formliner was used for cast-in-place railing at the job site, creating a seamless transition
Project Team
Owner: City of Akron
Engineer: Akron Engineering Bureau
Contractor: Kenmore Construction
Precast Producer: Lindsay Precast
Technical Details
Span: 42 ft
Rise: 10 ft
Length: 64 ft
Cover: 3 ft
Live Load: HL-93
Skew: None
Type: Arch-Box