Project Overview
In 2016, the United States Army Corps of Engineers completed a 27-acre expansion to Arlington National Cemetery known as the Millennium Project.
Bridge Design & Deep Earth Cover
The $81.8 million project included two ECO-SPAN® precast concrete arch bridges. Bridge #1 is a 42’ span twin-leaf Versa Series that carries Loop Road over a restored stream.
This arch was designed for up to 13.5' of earth cover, which is supported by mechanically stabilized earth retaining walls with natural stone facing.
Project Team
Owner: Arlington National Cemetery, VA
Engineer: U.S. Army Corps of Engineers
Contractor: Forrester Construction Company
Precast Producer: Faddis Concrete Products
Technical Details
Span: 42 ft
Rise: 20 ft
Length: 34 ft 6 in
Cover: 13 ft 6 in
Live Load: HL-93
Skew: None
Type: Twin-Leaf Versaâ„¢ Series Single-Radius