Project Overview

In 2016, the United States Army Corps of Engineers completed a 27-acre expansion to Arlington National Cemetery known as the Millennium Project.

Bridge Design & Deep Earth Cover

The $81.8 million project included two ECO-SPAN® precast concrete arch bridges. Bridge #1 is a 42’ span twin-leaf Versa Series that carries Loop Road over a restored stream.

This arch was designed for up to 13.5' of earth cover, which is supported by mechanically stabilized earth retaining walls with natural stone facing.

Project Team

Owner: Arlington National Cemetery, VA

Engineer: U.S. Army Corps of Engineers

Contractor: Forrester Construction Company

Precast Producer: Faddis Concrete Products

Technical Details

Span: 42 ft

Rise: 20 ft

Length: 34 ft 6 in

Cover: 13 ft 6 in

Live Load: HL-93

Skew: None

Type: Twin-Leaf Versaâ„¢ Series Single-Radius