Truckee Railyard Church Street Extension
Challenge
Crossing an environmentally sensitive creek without placing piers in the water while maintaining the aesthetic standards of a historic railyard redevelopment.
Solution
Pretek designed a 32-foot span ECO-SPANĀ® arch that provided a clear span over Trout Creek. This eliminated the need for mid-stream supports, protecting the ecosystem and meeting all local aesthetic requirements.